{"id":22748,"date":"2026-04-21T11:46:17","date_gmt":"2026-04-21T08:46:17","guid":{"rendered":"https:\/\/aseu.org.ua\/?p=22748"},"modified":"2026-04-21T11:57:11","modified_gmt":"2026-04-21T08:57:11","slug":"seau-held-an-open-meeting-of-the-energy-storage-committee-with-sigenergy-modularity-as-a-new-standard-for-energy-solutions","status":"publish","type":"post","link":"https:\/\/aseu.org.ua\/en\/seau-held-an-open-meeting-of-the-energy-storage-committee-with-sigenergy-modularity-as-a-new-standard-for-energy-solutions\/","title":{"rendered":"SEAU Held an Open Meeting of the Energy Storage Committee with Sigenergy: Modularity as a New Standard for Energy Solutions"},"content":{"rendered":"<p><b><i>On April 2, 2026, the Solar Energy Association of Ukraine (SEAU), together with its partner Sigenergy, held an open meeting of the Energy Storage Systems (BESS) Committee titled: \u201cModularity Without Limits: Universal Modular BESS by Sigenergy.\u201d<\/i><\/b><\/p>\n<p><span style=\"font-weight: 400;\">The event took place online via Zoom and brought together business representatives, installers, developers, and all stakeholders working with solar and energy storage solutions. The session was <\/span><b>moderated by Serhii Ruchko<\/b><span style=\"font-weight: 400;\">, Head of SEAU\u2019s BESS Committee.<\/span><\/p>\n<p><b>The speaker, Artem Li, Country Manager of Sigenergy in Ukraine<\/b><span style=\"font-weight: 400;\">, presented the company\u2019s innovative approach to energy storage systems based on modular architecture.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">During the presentation, the speaker outlined the evolution of technologies \u2013 from centralized solutions to flexible modular systems that significantly improve the reliability and efficiency of energy projects.<\/span><\/p>\n<blockquote><p><span style=\"font-weight: 400;\">\u201cIf a central inverter fails, the entire plant stops. In a modular architecture, the failure of a single component results in the loss of only part of the system, not the entire generation,\u201d emphasized Artem Li.<\/span><\/p><\/blockquote>\n<p><span style=\"font-weight: 400;\">According to the speaker, this principle forms the foundation of Sigenergy\u2019s modular BESS solutions, offering an alternative to traditional containerized and cabinet-based systems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Participants were introduced to the company\u2019s key technical solutions, including:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">modular architecture with precise capacity sizing based on customer needs;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">easy installation without heavy equipment or complex infrastructure;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">unlimited scalability;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">integrated inverter and BESS within a unified DC architecture;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">indoor and outdoor installation options (IP66).<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Special attention was given to safety \u2013 critical for commercial systems.<\/span><\/p>\n<blockquote><p><span style=\"font-weight: 400;\">\u201cEven in critical scenarios, we have proven that fire does not spread between modules \u2013 each module is effectively isolated and protected,\u201d the speaker noted.<\/span><\/p><\/blockquote>\n<p><span style=\"font-weight: 400;\">Sigenergy systems feature multi-level protection, including fire suppression, temperature control, smoke detection, and insulating materials.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A separate part of the presentation focused on backup power capabilities. Sigenergy solutions provide 0 ms switching time, ensuring uninterrupted power supply without even short outages.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Participants also explored:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">case studies from Europe, Africa, and other regions;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">large-scale installations (up to tens of MWh);<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">solutions for integration with diesel generators and microgrids.<\/span><\/li>\n<\/ul>\n<p><b>Founded in 2022, Sigenergy is already present in over 80 countries and continues to expand in Ukraine. <\/b><span style=\"font-weight: 400;\">The company combines innovative technologies with practical experience in regions with unstable energy systems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Meeting participants \u0430\u043a\u0442\u0438\u0432\u043d\u043e engaged in discussion, raising practical questions about BESS deployment in Ukraine and receiving expert insights.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">SEAU emphasizes that such events are an important tool for market development and the dissemination of advanced technological solutions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Modular energy storage systems open new opportunities for businesses \u2013 from increasing energy independence to optimizing investments and reducing risks \u2013 especially relevant amid the ongoing transformation of Ukraine\u2019s energy system.<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">P.S. Recordings of SEAU meetings and webinars are available to members upon request. All registered participants have received the session materials via email. Please check your inbox.<\/span><\/i><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On April 2, 2026, the Solar Energy Association of Ukraine (SEAU), together with its partner Sigenergy, held an open meeting of the Energy Storage Systems (BESS) Committee titled: \u201cModularity Without Limits: Universal Modular BESS by Sigenergy.\u201d The event took place online via Zoom and brought together business representatives, installers, developers, and all stakeholders working with &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"ast-button\" href=\"https:\/\/aseu.org.ua\/en\/seau-held-an-open-meeting-of-the-energy-storage-committee-with-sigenergy-modularity-as-a-new-standard-for-energy-solutions\/\"> <span class=\"screen-reader-text\">SEAU Held an Open Meeting of the Energy Storage Committee with Sigenergy: Modularity as a New Standard for Energy Solutions<\/span> \u0427\u0438\u0442\u0430\u0442\u0438 \u0434\u0430\u043b\u0456 \u00bb<\/a><\/p>\n","protected":false},"author":11,"featured_media":22749,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"site-sidebar-layout":"default","site-content-layout":"default","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"categories":[369],"tags":[],"_links":{"self":[{"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/posts\/22748"}],"collection":[{"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/comments?post=22748"}],"version-history":[{"count":3,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/posts\/22748\/revisions"}],"predecessor-version":[{"id":22754,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/posts\/22748\/revisions\/22754"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/media\/22749"}],"wp:attachment":[{"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/media?parent=22748"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/categories?post=22748"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/tags?post=22748"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}