{"id":20140,"date":"2025-10-14T11:48:23","date_gmt":"2025-10-14T08:48:23","guid":{"rendered":"https:\/\/aseu.org.ua\/?p=20140"},"modified":"2025-10-14T11:48:23","modified_gmt":"2025-10-14T08:48:23","slug":"ivan-balytskyi-for-energoreforma-on-key-legal-and-regulatory-barriers-for-investors-in-energy-storage-systems","status":"publish","type":"post","link":"https:\/\/aseu.org.ua\/en\/ivan-balytskyi-for-energoreforma-on-key-legal-and-regulatory-barriers-for-investors-in-energy-storage-systems\/","title":{"rendered":"Ivan Balytskyi for EnergoReforma: on Key Legal and Regulatory Barriers for Investors in Energy Storage Systems"},"content":{"rendered":"<p><b><i>Ivan Balytskyi, Head of the Legal Committee of the Solar Energy Association of Ukraine (SEAU) and Partner at the law firm \u201cSokolovskyi and Partners\u201d, SEAU\u2019s legal partner, gave an interview to <a href=\"https:\/\/reform.energy\/news\/partner-ak-sokolovskiy-i-partneri-ivan-balitskiy-pro-pravovi-ta-regulyatorni-bareri-dlya-investoriv-bess-v-ukraini-23938\" target=\"_blank\" rel=\"noopener\">EnergoReforma<\/a>, where he outlined the main legal and regulatory barriers for investors in energy storage systems (BESS) in Ukraine.<\/i><\/b><\/p>\n<p><span style=\"font-weight: 400;\">According to the expert, <\/span><b>interest in BESS in Ukraine is rapidly increasing<\/b><span style=\"font-weight: 400;\">, as these systems open new business opportunities, help balance the power grid, and enhance its flexibility. However, investors face a number of <\/span><b>legal challenges<\/b><span style=\"font-weight: 400;\"> that can determine the success or failure of a project.<\/span><\/p>\n<blockquote><p><span style=\"font-weight: 400;\">\u201cBefore starting the implementation of a BESS project, it is crucial to clearly understand your market status, the scope of permitting procedures, and licensing requirements. Unaccounted legal nuances can turn into serious barriers,\u201d emphasized Ivan Balytskyi.<\/span><\/p><\/blockquote>\n<p><span style=\"font-weight: 400;\">The expert noted that <\/span><b>BESS can be installed by consumers, active consumers, electricity producers, and storage operators<\/b><span style=\"font-weight: 400;\">, but each category is subject to its own set of rules. Systems used solely for self-consumption do not require permits, yet investors must still comply with <\/span><b>construction, electrical safety, and fire safety regulations<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<blockquote><p><span style=\"font-weight: 400;\">\u201cEven if a BESS is installed for internal consumption, it is necessary to comply with technical standards and obtain a construction or reconstruction permit, depending on the facility class. Without this, a project can be blocked at the commissioning stage,\u201d said Mr. Balytskyi.<\/span><\/p><\/blockquote>\n<p><span style=\"font-weight: 400;\">Another key aspect is <\/span><b>licensing energy storage activities<\/b><span style=\"font-weight: 400;\">. A license is not required if the BESS is used for own needs, has a capacity below 5 MW, or operates as part of a licensed solar power plant (SPP).<\/span><\/p>\n<blockquote><p><span style=\"font-weight: 400;\">\u201cFor an investor, it\u2019s important to understand not only the technical but also the legal architecture of the project. This allows avoiding unnecessary costs, properly planning grid connection, and mitigating regulatory risks,\u201d stressed the expert.<\/span><\/p><\/blockquote>\n<p><span style=\"font-weight: 400;\">He also added that <\/span><b>additional operational costs<\/b><span style=\"font-weight: 400;\"> may arise, related to <\/span><b>imbalances, transmission, distribution, and dispatching of electricity<\/b><span style=\"font-weight: 400;\">, which must be considered in financial models.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Summing up, <\/span><b>Ivan Balytskyi emphasized<\/b><span style=\"font-weight: 400;\">:<\/span><\/p>\n<blockquote><p><span style=\"font-weight: 400;\">\u201cThe BESS market offers significant opportunities for investors, but legal preparedness and the proper project structure form the foundation \u2013 without them, even the most advanced technologies will not function effectively.\u201d<\/span><\/p><\/blockquote>\n<p><a href=\"https:\/\/reform.energy\/news\/partner-ak-sokolovskiy-i-partneri-ivan-balitskiy-pro-pravovi-ta-regulyatorni-bareri-dlya-investoriv-bess-v-ukraini-23938\" target=\"_blank\" rel=\"noopener\"><b>Read the full interview<\/b><\/a><\/p>\n<p><b>Reminder:<\/b><span style=\"font-weight: 400;\"> On <\/span><b>14 November 2025 in Warsaw<\/b><span style=\"font-weight: 400;\">, the <\/span><b>Solar Energy Association of Ukraine <\/b><span style=\"font-weight: 400;\">will host the <\/span><a href=\"https:\/\/rebuildukraine.in.ua\/solar-invest-forum\" target=\"_blank\" rel=\"noopener\"><b>Solar &amp; BESS Invest Forum UA<\/b><\/a><span style=\"font-weight: 400;\"> within the framework of the <\/span><a href=\"https:\/\/rebuildukraine.in.ua\/\" target=\"_blank\" rel=\"noopener\"><b>ReBuild Ukraine Energy 2025<\/b><\/a><span style=\"font-weight: 400;\"> international exhibition and forum. The main focus of the forum: <\/span><b>investment opportunities, financing, and technical solutions for energy storage systems<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ivan Balytskyi, Head of the Legal Committee of the Solar Energy Association of Ukraine (SEAU) and Partner at the law firm \u201cSokolovskyi and Partners\u201d, SEAU\u2019s legal partner, gave an interview to EnergoReforma, where he outlined the main legal and regulatory barriers for investors in energy storage systems (BESS) in Ukraine. According to the expert, interest &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"ast-button\" href=\"https:\/\/aseu.org.ua\/en\/ivan-balytskyi-for-energoreforma-on-key-legal-and-regulatory-barriers-for-investors-in-energy-storage-systems\/\"> <span class=\"screen-reader-text\">Ivan Balytskyi for EnergoReforma: on Key Legal and Regulatory Barriers for Investors in Energy Storage Systems<\/span> \u0427\u0438\u0442\u0430\u0442\u0438 \u0434\u0430\u043b\u0456 \u00bb<\/a><\/p>\n","protected":false},"author":11,"featured_media":20141,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"site-sidebar-layout":"default","site-content-layout":"default","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"categories":[369],"tags":[],"_links":{"self":[{"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/posts\/20140"}],"collection":[{"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/comments?post=20140"}],"version-history":[{"count":1,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/posts\/20140\/revisions"}],"predecessor-version":[{"id":20143,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/posts\/20140\/revisions\/20143"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/media\/20141"}],"wp:attachment":[{"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/media?parent=20140"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/categories?post=20140"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aseu.org.ua\/en\/wp-json\/wp\/v2\/tags?post=20140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}